STATUS:

APPROVED

299A1 - Lawton Chiles ES

General Information

Subcontractor:
H3FOUR General Contractors. LLC
Subcontractor Project Manager:
Don Alcordo
Phone #:
407-620-2279
Email:

SECTION #1: Job-Site Specific Accident Prevention Plan

Please download the documents you wish to review.

Accident Prevention Plan

Key personnel

Emergency List

OSHA 300

Appointment Letter

Basic Safety AHA:

7.-

Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?

YES

8.-

Do you plan to perform any excavation work at any point during your project?

NO

9.-
10.-

Do you anticipate performing any electrical or demolition work at any stage of your project?

NO

Attach a copy of your Certificate of Insurance (COI):?

SECTION #2: Required Training

OSHA 30

OSHA 10

First Aid CPR

Fall Protection

SECTION #3: Equipment Certification (If Applicable)

Do you plan to use any of the following equipment during your activities on the project?

Scissor Lift Use?
Boomlift?
Forklift?
Welder?
Heavy Equipment?
YES
NO
NO
NO
NO

If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.

Person Responsible for Submitting the Information:

Name:

Don Alcordo

Position:

Project Manager

Email:

Signature:

Image-empty-state_edited_edited.jpg

⚠️ For LEGO CO Safety Department Use ONLY

Good morning,

The MOBILIZATION CANNOT BE APPROVED for the following reasons:

A) Recommended improvements to the Safety Plan, focused on regulatory compliance and OSHA standards:

  1. Formal integration of the Fall Protection Program. Whenever work is planned at heights greater than 6 feet, the Fall Protection Plan must be properly developed, proposing adequate controls, appropriate levels of supervision, and other relevant measures.
  2. Documented training records and follow-up.
  3. Emergency response plan including maps and clearly defined roles.
  4. Documented control of equipment inspections and certifications.

B) Use the Appointment Letter Template provided in the form as a reference. Please note that the appointment letter is not a contact list.

C) Use the Basic Safety AHA included in the form. Specific AHAs will be collected at a later stage.

D) In the Fall Protection Plan, please add:

  1. The name of the person who created the plan. And Signature
  2. The credentials of the competent person who developed the plan.

 

E) Include the appropriate SDS. In the document submitted, you sent the Safety Plan again instead of the SDS. At this stage, you must include the corresponding SDS.

F) Provide the Fall Protection certification of the competent person who will be present at the job site.

G) It is noted that the only person authorized to operate the AWP is Emilio Rivera.

08/11/2025 8:30 AM

 

NEW NOTES/////////////////////////////////////////////////

 

Good Morning Rodrigo,

Item E - Our scope is limited to selective demolition only; we do not supply any materials onsite. Can you please clarify the specific SDS we would need to submit for selective demolition?

R.- Regarding the SDS, the answer depends on the following: Will you be using gasoline? Will you be using any type of cleaners? Will you be using any substances other than construction materials? The SDS refers to any chemical that will be used on the project—for example, gasoline to refill a concrete saw, or diesel for the boom lift or heavy machinery. There is almost always something that requires an SDS. You will need to review this detail and let me know.

Item G - Emilio Rivera is the Sunbelt trainer, Erick Vasquez & Ronald Tan are H3FOUR certified AWP operators.

R.- You are correct—the trainer’s name is Emilio Rivera, therefore Erick Vasquez and Ronald Tan are approved for AWP.

NOTE: Since you are performing demolition work, you should also include a Lockout/Tagout (LOTO) Plan in your Safety Plan.

Thank you,

EMAIL FROM SUBCONTRACTOR 08/11/2025

 

NEW NOTES/////////////////////////////////////////////////

 

Nuevas Notas:

  1. Observation #1 has been corrected.
  2. Please use the Appointment Letter Template. A list is not considered an appointment letter. You submitted a list instead of the required template.
  3. Observation #3 has been properly corrected.
  4. Complete the information correctly in the Basic Safety AHA.

Thank you.

08/18/2025v 14:08 PM

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421

Miami  |  Tampa  |  Orlando  |  Pensacola  |  Palm Beach  |  Jacksonville

Copyright © 2024 LEGO Construction Co. All Rights Reserved

bottom of page