STATUS:

APPROVED

294B1 - Lakeview ES- Reroofing

General Information

Subcontractor:
COR3 Mechanical
Subcontractor Project Manager:
Kelly Maniar
Phone #:
321-323-4449
Email:

SECTION #1: Job-Site Specific Accident Prevention Plan

Please download the documents you wish to review.

Accident Prevention Plan

Key personnel

Emergency List

OSHA 300

Appointment Letter

Basic Safety AHA:

7.-

Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?

NO

8.-

Do you plan to perform any excavation work at any point during your project?

NO

9.-
10.-

Do you anticipate performing any electrical or demolition work at any stage of your project?

NO

Attach a copy of your Certificate of Insurance (COI):?

SECTION #2: Required Training

OSHA 30

OSHA 10

First Aid CPR

Fall Protection

SECTION #3: Equipment Certification (If Applicable)

Do you plan to use any of the following equipment during your activities on the project?

Scissor Lift Use?
Boomlift?
Forklift?
Welder?
Heavy Equipment?
NO
NO
NO
NO
NO

If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.

Person Responsible for Submitting the Information:

Name:

kelly maniar

Position:

Owner

Email:

Signature:

Image-empty-state_edited_edited.jpg

⚠️ For LEGO CO Safety Department Use ONLY

1.- The Safety Plan you submitted is not adequate. It must include company policies, procedures, specific PPE requirements, reporting systems, etc.

2.- The required OSHA 300A forms are for the last three years: 2024, 2023, and 2022. You only submitted 2022 and 2024. Please provide the one for 2023.

3.- Please complete the Basic Safety AHA properly, including name and signature on page 14.

4.- Please complete the description of the COI properly.

5.- The SDS you submitted is not adequate.

6.- You submitted the OSHA 30 for one supervisor and the OSHA 10 for one worker. Is this the complete personnel that will be assigned to the project?

7.- Please attach the First Aid/CPR certificate.

 

09/02/2025 10:42 AM

 

NEW NOTES//////

 

1.- CORRECTED

2.- CORRECTED

3.- CORRECTED

4.- CORRECTED

5.- CORRECTED

6.- Send a List of the workers to rq@legocc.com

7.- CORRECTED

 

09/03/2025 9:13 AM

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421

Miami  |  Tampa  |  Orlando  |  Pensacola  |  Palm Beach  |  Jacksonville

Copyright © 2024 LEGO Construction Co. All Rights Reserved

bottom of page