top of page
STATUS:
REJECTED
273C1 - Park Vista Community HS
General Information
Subcontractor:
Mardale Specialties Direct
Subcontractor Project Manager:
Sarah Selbach
Phone #:
954-510-7700
Email:
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
NO
8.-
Do you plan to perform any excavation work at any point during your project?
NO
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
NO
Attach a copy of your Certificate of Insurance (COI):?
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
Scissor Lift Use? | Boomlift? | Forklift? | Welder? | Heavy Equipment? |
|---|---|---|---|---|
NO | NO | NO | NO | NO |
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.
Person Responsible for Submitting the Information:
Name:
Sarah Selbach
Position:
Project Manager
Email:
Signature:
⚠️ For LEGO CO Safety Department Use ONLY
Observations:
- Use and complete the Basic Safety AHA provided in the form.
- Attach the OSHA 10 certificates for your workers.
- Attach a First Aid and CPR certificate that is less than two years old.
- Attach all required supporting documentation to complete the mobilization review.
3/17/2026 10:51 AM
Observations:
- Use and complete the Basic Safety AHA provided in the form.
- Attach the OSHA 10 certificates for your workers.
- CORRECTED
- NA
3/17/2026 10:51 AM
bottom of page
