STATUS:

APPROVED

267H1 - Ft. Lauderdale Esp renovations

General Information

Subcontractor:
Space Solutions Of Florida Inc
Subcontractor Project Manager:
Cristofer Pinzones
Phone #:
7864861896
Email:

SECTION #1: Job-Site Specific Accident Prevention Plan

Please download the documents you wish to review.

Accident Prevention Plan

Key personnel

Emergency List

OSHA 300

Appointment Letter

Basic Safety AHA:

7.-

Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?

NO

8.-

Do you plan to perform any excavation work at any point during your project?

NO

9.-
10.-

Do you anticipate performing any electrical or demolition work at any stage of your project?

NO

Attach a copy of your Certificate of Insurance (COI):?

SECTION #2: Required Training

OSHA 30

OSHA 10

First Aid CPR

Fall Protection

SECTION #3: Equipment Certification (If Applicable)

Do you plan to use any of the following equipment during your activities on the project?

Scissor Lift Use?
Boomlift?
Forklift?
Welder?
Heavy Equipment?
YES
NO
NO
NO
NO

If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.

Person Responsible for Submitting the Information:

Name:

Paul Pinzones

Position:

PM

Email:

Signature:

Image-empty-state_edited_edited.jpg

⚠️ For LEGO CO Safety Department Use ONLY

  1. Please review and resubmit your Safety Plan.
  2. Submit the OSHA 300A for the years 2024, 2023, and 2022.
  3. Use the provided template as a reference and resubmit the Appointment Letter. You submitted the same list three times (as Key Personnel, as Emergency List, and as Appointment Letter). In addition, please correct the lists to include the names of the individuals. The lists you submitted currently show only the job titles without the corresponding names.
  4. Submit the Basic Safety AHA. Any other AHA will be rejected. The required template was provided in the mobilization form.
  5. Submit the COI including General Liability and Workers Compensation. Also, please make sure to include the appropriate description, as you only submitted a vehicle insurance policy.
  6. Attach the appropriate SDS. You submitted what appears to be your Safety Plan. That Safety Plan may belong under item #1, while the SDS must be correctly submitted under the SDS section.
  7. You only submitted one worker’s OSHA 10. Will you not have more workers on this project?
  8. You submitted the CPR certificate for Cristofer Pinzones, who I understand is the PM of the project. Please clarify: will the PM be physically present on site at all times during your activities? The CPR/First Aid requirement must be fulfilled by the supervisor who will be on site, as the purpose is to ensure proper emergency assistance. If the trained individual spends most of the time in the office or rotating between projects, the requirement would not be properly covered.
  9. In the Fall Protection section, you attached the Mobilization Checklist, which is not correct.
  10. In the Operator Certifications section, once again, only the certification of the PM was submitted. Please clarify this by email to rq@legocc.com, since as of now only the PM would be authorized to operate the AWP.

09/09/2025 9:41AM

 

  1. CORRECTED
  2. CORRECTED
  3. CORRECTED
  4. Submit the Basic Safety AHA. Any other AHA will be rejected. The required template was provided in the mobilization form. NOT CORRECTED
  5. Submit the COI including General Liability and Workers Compensation. Also, please make sure to include the appropriate description, as you only submitted a vehicle insurance policy. NOT CORRECTED
  6. CORRECTED
  7. You only submitted one worker’s OSHA 10. Will you not have more workers on this project? Provide Workers List for this project by email to rq@legocc.com NOT CORRECTED
  8. CORRECTED
  9. CORRECTED
  10. In the Operator Certifications section, once again, only the certification of the PM was submitted. Please clarify this by email to rq@legocc.com, since as of now only the PM would be authorized to operate the AWP. NOT CORRECTED

09/17/2025 1:33 PM

 

  1. CORRECTED
  2. CORRECTED
  3. CORRECTED
  4. CORRECTED
  5. CORRECTED
  6. CORRECTED
  7. Submit OSHA 10.
  8. CORRECTED
  9. CORRECTED

09/22/2025 3:29 PM

 

  1. CORRECTED
  2. CORRECTED
  3. CORRECTED
  4. CORRECTED
  5. CORRECTED
  6. CORRECTED
  7. CORRECTED
  8. CORRECTED
  9. CORRECTED

10/14/25 10:35 AM

 

 

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421

Miami  |  Tampa  |  Orlando  |  Palm Beach  |  Jacksonville

Copyright © 2024 LEGO Construction Co. All Rights Reserved

bottom of page