267F1 - Corrections for Rohde Office Towers Restrooms (Phase 1 of 8)

General Information

Subcontractor:
First Plumbing Corp.
Subcontractor Project Manager:
Juan Lobo
Phone #:
7865719344
Email:

SECTION #1: Job-Site Specific Accident Prevention Plan

Please download the documents you wish to review.

Accident Prevention Plan

Key personnel

Emergency List

OSHA 300

Appointment Letter

Basic Safety AHA:

7.-

Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?

NO

8.-

Do you plan to perform any excavation work at any point during your project?

NO

9.-
10.-

Do you anticipate performing any electrical or demolition work at any stage of your project?

YES

Attach a copy of your Certificate of Insurance (COI):?

SECTION #2: Required Training

OSHA 30

OSHA 10

First Aid CPR

Fall Protection

SECTION #3: Equipment Certification (If Applicable)

Do you plan to use any of the following equipment during your activities on the project?

Scissor Lift Use?
Boomlift?
Forklift?
Welder?
Heavy Equipment?
NO
NO
NO
NO
NO

If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.

Person Responsible for Submitting the Information:

Name:

Juan Lobo

Position:

Owner

Email:

Signature:

Image-empty-state_edited_edited.jpg

⚠️ For LEGO CO Safety Department Use ONLY

Good afternoon,

Note: Juan, it is good that you have the habit of completing the OSHA 300 form; however, you should be aware that this form is mandatory only for companies with more than 10 employees. Therefore, I repeat, it is a very good practice but not mandatory for you.

Observations:

  1. The Basic Safety AHA must have the AHA information completed as applicable, please refer to the attached image.
  2. Do you have Workers Compensation? If not, please send the Workers Compensation Exception form.
  3. CPR, First Aid, and Bloodborne Pathogens training: As part of LEGO’s policies and OSHA standards, first aid must be "reasonably accessible." OSHA generally interprets "reasonably accessible" as within 3 to 4 minutes. As we all know, this is impractical unless the work is performed in a hospital or medical center. Therefore, compliance with this requirement is mandatory and does not need to be included in a contract. As everyone knows, since these are federal regulations, they must be complied with whether or not they are explicitly mentioned in the contract. For this brief explanation, it is required that you obtain the mentioned training; I recommend the American Red Cross option. If you have any questions regarding this point, please call me at 786-247-3707.

08/11/2025 6:46 PM

 

The correction for observation #1 on the list has been completed; however, the corrections for observations #2 and #3 have not been made. Therefore, the mobilization cannot be approved. Please make the necessary corrections to the following:

  1. Do you have Workers Compensation? If not, please provide the Workers Compensation Exception form.
  2. CPR, First Aid, and Bloodborne Pathogens Training: As part of LEGO’s policies and OSHA standards, first aid must be "reasonably accessible." OSHA generally interprets "reasonably accessible" as within 3 to 4 minutes. As we all know, this is impractical unless the work is being performed in a hospital or medical center. Therefore, compliance with this requirement is mandatory and is not contingent upon its inclusion in the contract. Since these are federal regulations, they must be followed whether or not they are explicitly mentioned in the agreement.For this reason, you are required to obtain the mentioned training. I recommend the American Red Cross option. Should you have any questions regarding this matter, please feel free to contact me at 786-247-3707.

8/12/2025 1:33 PM

 

///// NEW NOTE//////

 

Your mobilization has been approved with observation under Code #75522681.

Observation: The subcontractor did not submit a FIRST AID/CPR/AED certificate. A period of 60 days is granted to obtain and submit the certificate.

Thank you.

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421