STATUS:

APPROVED

207E1 - USCG STA Islamorada

General Information

Subcontractor:
A Steel Fabricators
Subcontractor Project Manager:
Nathan Mikus
Phone #:
240-812-2599
Email:

SECTION #1: Job-Site Specific Accident Prevention Plan

Please download the documents you wish to review.

Accident Prevention Plan

Key personnel

Emergency List

OSHA 300

Appointment Letter

Basic Safety AHA:

7.-

Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?

YES

8.-

Do you plan to perform any excavation work at any point during your project?

YES

9.-
10.-

Do you anticipate performing any electrical or demolition work at any stage of your project?

NO

Attach a copy of your Certificate of Insurance (COI):?

SECTION #2: Required Training

OSHA 30

OSHA 10

First Aid CPR

Fall Protection

SECTION #3: Equipment Certification (If Applicable)

Do you plan to use any of the following equipment during your activities on the project?

Scissor Lift Use?
Boomlift?
Forklift?
Welder?
Heavy Equipment?
NO
YES
YES
YES
YES

If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.

Person Responsible for Submitting the Information:

Name:

Nathan mikus

Position:

President

Email:

Signature:

Image-empty-state_edited_edited.jpg

⚠️ For LEGO CO Safety Department Use ONLY

1.- The Safety Plan submitted is not adequate. Please review the list of criteria for submitting your Safety Plan.

I have noticed that your Fall Protection Plan and Excavation Plan are adequate and well structured. I believe the wrong documentation was attached in the APP section by mistake. Kindly review the documentation and resubmit your complete Safety Plan in this section.

 

09/22/2025 3:51 PM

 

1.- The Safety Plan submitted is not adequate. Please review the list of criteria for submitting your Safety Plan.

I have noticed that your Fall Protection Plan and Excavation Plan are adequate and well structured. I believe the wrong documentation was attached in the APP section by mistake. Kindly review the documentation and resubmit your complete Safety Plan in this section. NOT CORRECTED

 

09/24/2025 1:48 PM

TEMPORARY

The mobilization will be temporarily approved. If the subcontractor does not correct the observation, their work will be stopped again.

 

 

APPROVED

09/30/2025 2:50 PM

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421

Miami  |  Tampa  |  Orlando  |  Palm Beach  |  Jacksonville

Copyright © 2024 LEGO Construction Co. All Rights Reserved

bottom of page