STATUS:

REJECTED

708B - HARB

General Information

Subcontractor:
East Coast Rigging & Contracting
Subcontractor Project Manager:
William Schikner
Phone #:
443-243-4533
Email:

SECTION #1: Job-Site Specific Accident Prevention Plan

Please download the documents you wish to review.

Accident Prevention Plan

Key personnel

Emergency List

OSHA 300

Appointment Letter

Basic Safety AHA:

7.-

Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?

YES

8.-

Do you plan to perform any excavation work at any point during your project?

NO

9.-
10.-

Do you anticipate performing any electrical or demolition work at any stage of your project?

NO

Attach a copy of your Certificate of Insurance (COI):?

SECTION #2: Required Training

OSHA 30

OSHA 10

First Aid CPR

Fall Protection

SECTION #3: Equipment Certification (If Applicable)

Do you plan to use any of the following equipment during your activities on the project?

Scissor Lift Use?
Boomlift?
Forklift?
Welder?
Heavy Equipment?
NO
NO
YES
NO
YES

If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.

Person Responsible for Submitting the Information:

Name:

Andre Stackhouse

Position:

Compliance Officer

Email:

Signature:

Image-empty-state_edited_edited.jpg

⚠️ For LEGO CO Safety Department Use ONLY

1.- The Safety Plan you submitted is not adequate.

2.- The Key Personnel list must include phone numbers and email addresses.

3.- Your OSHA 300A for 2022 must be properly completed, including signature, etc.

4.- Please use the Basic Safety AHA template provided.

5.- In your Fall Protection Plan, you must include proper procedures, including accident/incident investigation, emergency plans, rescue mechanisms, and required trainings. In addition, you must remove the “Safety Monitor” since our policies do not allow the use of a safety monitor as an acceptable option for fall protection.

6.- The COI must be properly completed, indicating the correct Certificate Holder. The appropriate description of the COI must also be included.

7.- Please provide the OSHA 10 certificates of your workers. You only submitted one certificate, and the project will certainly require more than one worker; therefore, please submit the corresponding certificates.

 

09/02/2025 11:06 AM

 

 

 

NEW NOTES///////

1.- CORRECTED

2.- CORRECTED

3.- CORRECTED

4.- Please use the Basic Safety AHA template provided. NOT CORRECTED

5.- In your Fall Protection Plan, you must include proper procedures, including accident/incident investigation, emergency plans, rescue mechanisms, and required trainings. In addition, you must remove the “Safety Monitor” since our policies do not allow the use of a safety monitor as an acceptable option for fall protection. NOT CORRECTED

6.- The COI must be properly completed, indicating the correct Certificate Holder. The appropriate description of the COI must also be included. NOT CORRECTED

7.- CORRECTED

 

09/03/2025 6:20 PM

 

NEW NOTES///////

1.- CORRECTED

2.- CORRECTED

3.- CORRECTED

4.- Please use the Basic Safety AHA template provided. NOT CORRECTED

5.- In your Fall Protection Plan, you must include proper procedures, including accident/incident investigation, emergency plans, rescue mechanisms, and required trainings. In addition, you must remove the “Safety Monitor” since our policies do not allow the use of a safety monitor as an acceptable option for fall protection. NOT CORRECTED

6.- The COI must be properly completed, indicating the correct Certificate Holder. The appropriate description of the COI must also be included. NOT CORRECTED

7.- CORRECTED

09/05/2025 12:14 PM

 

NEW NOTES///////

1.- CORRECTED

2.- CORRECTED

3.- CORRECTED

4.- Please use the Basic Safety AHA template provided. NOT CORRECTED

5.- CORRECTED

6.- CORRECTED

7.- CORRECTED

09/08/2025 1:47 PM

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421

Miami  |  Tampa  |  Orlando  |  Pensacola  |  Palm Beach  |  Jacksonville

Copyright © 2024 LEGO Construction Co. All Rights Reserved

bottom of page