304B1 - MDC NC Bldg 8 Semiconductors

Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.

  1. The document submitted as the Safety Plan appears to be an Excel checklist. It is likely that the wrong file was attached. Please submit the correct and complete Safety Plan.
  2. Please use the Appointment Letter template as a reference. The list of personnel or emergency contacts is not an Appointment Letter.
  3. Please use and submit the Basic Safety AHA. Project-specific AHAs will be requested later in the project.
  4. The Lockout/Tagout (LO/TO) Program is incomplete. Beyond the general information provided, the program must clearly identify the procedures, responsible persons, competent personnel, and any other relevant personnel. Please submit the complete and adequate LO/TO Plan.
  5. The Certificate of Insurance (COI) must be submitted in order to approve mobilization. Do not forget to include Workers’ Compensation.
  6. The Safety Data Sheets (SDS) are outdated, with several documents dating back to 2005, 2007, and similar. The SDS must be updated; it is recommended to visit the manufacturer’s website to obtain the most current information.

08/14/2025 8:27 PM

 

  1. The document submitted as the Safety Plan appears to be an Excel checklist. It is likely that the wrong file was attached. Please submit the correct and complete Safety Plan.
  2. Please use the Appointment Letter template as a reference. The list of personnel or emergency contacts is not an Appointment Letter.
  3. CORRECTED
  4. CORRECTED
  5. CORRECTED
  6. CORRECTED

8/25/2025 11:34 AM

 

MOBILIZATION APPROVED

08/25/2025 3:43 PM

General Information

Subcontractor:
Superior Electrical Contractors
Subcontractor Project Manager:
Daniel Puente
Phone #:
3054776328
CODE:

9289346265

SECTION #1: Job-Site Specific Accident Prevention Plan

Please download the documents you wish to review.

Accident Prevention Plan

Safety Plan

Key personnel

Key Personnel

Emergency List

Emergency List

OSHA 300

OSHA 300 (1)
OSHA 300 (2)
OSHA 300 (3)

Appointment Letter

Appointment Letter

Basic Safety AHA:

Basic Safety AHA
7.-

Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?

Fall Protection
Fall Protection Plan
8.-

Do you plan to perform any excavation work at any point during your project?

Excavation
Excavation Plan
9.-
10.-

Do you anticipate performing any electrical or demolition work at any stage of your project?

LO/TO
LO/TO Plan

Attach a copy of your Certificate of Insurance (COI):?

COI
11.-

SDS

SDS

SECTION #2: Required Training

OSHA 30

OSHA 30

OSHA 10

First Aid CPR

OSHA 10
First Aid/CPR

Fall Protection

Fall Protection Certificate

SECTION #3: Equipment Certification (If Applicable)

Do you plan to use any of the following equipment during your activities on the project?

Scissor Lift
Boomlift
Forklift
Welder
Heavy Equipment (Excavator, etc)

If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.

Operator Certificate
Operator Certificate
Operator Certificate

Person Responsible for Submitting the Information:

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421

Miami  |  Tampa  |  Orlando  |  Palm Beach  |  Jacksonville

Copyright © 2024 LEGO Construction Co. All Rights Reserved

bottom of page