top of page
299A1 - Lawton Chiles ES
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
- Attach the company’s OSHA 300A. You mistakenly attached the OSHA 30.
- Complete the information on the Basic Safety AHA (top left of the first page).
- In the COI, include the appropriate project description.
08/26/2025 2:57 PM
- Attach the company’s OSHA 300A. You mistakenly attached the OSHA 30. NOT RECUIRED (CORRECTED)
- CCORRECTED
- CORRECTED
08/26/2025 2:57 PM
General Information
Subcontractor:
Lotti Services & Construction
Subcontractor Project Manager:
Janitza Gutierrez
Phone #:
3214241470
CODE:
065120986
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.
Person Responsible for Submitting the Information:
bottom of page