299A1 - Lawton Chiles ES
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
Observations:
- Please submit an adequate Safety Plan.
- Attach the OSHA 300A for the years 2022, 2023, and 2024.
- Use the Basic Safety AHA.
- Include an adequate Fall Protection Plan.
- Provide the appropriate description in the COI and include the Workers’ Compensation in the COI.
09/17/2025 1:38 PM
- Please submit an adequate Safety Plan. NOT CORRECTED
- Attach the OSHA 300A for the years 2022, 2023, and 2024. NOT CORRECTED
- Use the Basic Safety AHA. NOT CORRECTED
- Include an adequate Fall Protection Plan. NOT CORRECTED
- Provide the appropriate description in the COI and include the Workers’ Compensation in the COI. NOTCORRECTED
09/22/2025 3:22 PM
- CORRECTED
- CORRECTED
- CORRECTED
- CORRECTED
- Provide the appropriate description in the COI and include the Workers’ Compensation in the COI. NOTCORRECTED
09/24/2025 2:02 PM
- CORRECTED
- CORRECTED
- CORRECTED
- CORRECTED
- CORRECTED
09/25/2025 9:56 AM
General Information
Subcontractor:
Drywall Elements
Subcontractor Project Manager:
Andy Briones
Phone #:
3212002249
CODE:
17502086
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.
Person Responsible for Submitting the Information:
bottom of page