299A1 - Lawton Chiles ES
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
Observations:
1.- Please submit the Safety Plan; the document you sent is not a Safety Plan.
2.- Please use the Appointment Letter Template; using the same list of key personnel as an appointment letter is not acceptable.
3.- Please use the BASIC SAFETY AHA as indicated in the form.
4.- Please submit the COI that includes General Liability.
08/19/2025 9:08 PM
NEW NOTES////////
- Observation #1 – Corrected.
- Observation #2 – Corrected.
- The AHA submitted was rejected. Please review and use the Basic Safety AHA.
- Observation #4 – Corrected.
08/20/2025 9:32 PM
MOBILIZATION APPROVED
08/20/2025 6:14 PM
General Information
Subcontractor:
James Blinds
Subcontractor Project Manager:
Bryce Williams
Phone #:
937-869-8880
CODE:
62535947
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.