297B1 - Pedestrian Bridge Restoration
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
- A) Your safety plan indicates the use of a “Safety Monitor” as an option. Under LEGO Co. policies, the Safety Monitor is not acceptable. Please modify your safety plan to comply with LEGO Co. policies.
B) You must include a proper incident investigation procedure, and also include the form that will be used to report incidents if they occur. - In the Key Personnel section, you attached the safety plan again, which is not acceptable. Please remember that in your safety plan and Key Personnel section, you should only mention personnel from your own company, not LEGO Construction staff.
- In the Emergency List section, you again attached the safety plan, which is not acceptable. Please remember that in your safety plan and Key Personnel section, you should only list personnel from your own company, not LEGO Construction staff.
- Please use the Appointment Letter template to submit the appropriate information.
- The Fall Protection Plan you submitted is incomplete. It does not indicate procedures, policies, control systems, competent personnel, work stages, risk evaluation, emergency measures, etc. Please submit a complete Fall Protection Plan that includes all necessary sections, including the rescue plan.
- You must submit OSHA 10 certificates for all workers.
- The American Red Cross certificate you submitted is expired. Please submit a valid certificate.
- You have not submitted the Scissor Lift and Boom Lift Operator certificates.
- You must submit the Basic Safety AHA, as this procedure is mandatory. Since your work will involve working at height, you must also submit a separate AHA for working at height.
Dear subcontractor, the information provided through this form is of critical importance to the project. Copying and pasting the same document multiple times or submitting expired documentation is not acceptable. I kindly ask that you take the necessary time to carefully review the form and submit the appropriate information. Your safety plan, in general, lacks many details; however, given the nature of your work, I am focusing my review on the basics plus working at height requirements.
NEW NOTES/////////
- As previously indicated, the Safety Monitor is not approved under LEGO Co’s fall protection policies. Please make the necessary corrections as previously instructed by YTA.
- The Emergency List must include the names and contact information of the personnel from your company who should be contacted in case of emergencies.
- Please use the Appointment Letter format that was previously provided.
- Attach the OSHA 10 certifications of your workers.
- It is clearly stated that the only person authorized to operate the AWP in this project is Mr. Gustavo Salinas.
- Please use the Basic Safety AHA as previously indicated.
08/25/2025 11:43 AM
NEW NOTES/////////
- CORRECTED
- CORRECTED
- CORRECTED
- It is clearly stated that the only person authorized to operate the AWP in this project is Mr. Gustavo Salinas.
- CORRECTED
09/09/2025 9:05 AM
MOBILIZATION APPROVED
General Information
Subcontractor:
Western Specialty Contractors
Subcontractor Project Manager:
Kyle McDonald
Phone #:
954-637-9392
CODE:
124795242
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.