top of page
273C1 - Park Vista Community HS
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
Observations:
- Use and complete the Basic Safety AHA provided in the form.
- Attach the OSHA 10 certificates for your workers.
- Attach a First Aid and CPR certificate that is less than two years old.
- Attach all required supporting documentation to complete the mobilization review.
3/17/2026 10:51 AM
Observations:
- Use and complete the Basic Safety AHA provided in the form.
- Attach the OSHA 10 certificates for your workers.
- CORRECTED
- NA
3/17/2026 10:51 AM
General Information
Subcontractor:
Mardale Specialties Direct
Subcontractor Project Manager:
Sarah Selbach
Phone #:
954-510-7700
CODE:
4482489
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.
Person Responsible for Submitting the Information:
bottom of page
