273 D -PBS-UB Kinsey-Palmview ES FCA Renovations

Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.

Observations:

 

  1. Attach the complete Safety Plan of Stricker Electric in digital format. We have worked with this subcontractor in the past, and I understand that the company has a good safety plan. I am not sure why the company’s safety plan was not attached.
  2. Attach the appropriate plans in the sections that request specific safety plans, such as the Lockout/Tagout (LO/TO) plan. The document you submitted does not constitute an adequate LO/TO safety plan.
  3. In the CPR certificate section, attach only valid CPR certificates that are current and less than two years old.

03/17/2026 10:00 AM

 

  1. CORRECTED
  2. CORRECTED
  3. NOTED

03/25/2026 10:17 AM

General Information

Subcontractor:
Stryker Electrical Contracting, LLC
Subcontractor Project Manager:
KEVIN JULIANO/LAMAYA JENNINGS
Phone #:
7722193389
CODE:

0960239887

SECTION #1: Job-Site Specific Accident Prevention Plan

Please download the documents you wish to review.

Accident Prevention Plan

Safety Plan

Key personnel

Key Personnel

Emergency List

Emergency List

OSHA 300

OSHA 300 (1)
OSHA 300 (2)
OSHA 300 (3)

Appointment Letter

Appointment Letter

Basic Safety AHA:

Basic Safety AHA
7.-

Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?

Fall Protection
Fall Protection Plan
8.-

Do you plan to perform any excavation work at any point during your project?

Excavation
Excavation Plan
9.-
10.-

Do you anticipate performing any electrical or demolition work at any stage of your project?

LO/TO
LO/TO Plan

Attach a copy of your Certificate of Insurance (COI):?

COI
11.-

SDS

SDS

SECTION #2: Required Training

OSHA 30

OSHA 30

OSHA 10

First Aid CPR

OSHA 10
First Aid/CPR

Fall Protection

Fall Protection Certificate

SECTION #3: Equipment Certification (If Applicable)

Do you plan to use any of the following equipment during your activities on the project?

Scissor Lift
Boomlift
Forklift
Welder
Heavy Equipment (Excavator, etc)

If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.

Operator Certificate
Operator Certificate
Operator Certificate

Person Responsible for Submitting the Information:

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421