273 D -PBS-UB Kinsey-Palmview ES FCA Renovations
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
Observations:
- Attach the complete Safety Plan of Stricker Electric in digital format. We have worked with this subcontractor in the past, and I understand that the company has a good safety plan. I am not sure why the company’s safety plan was not attached.
- Attach the appropriate plans in the sections that request specific safety plans, such as the Lockout/Tagout (LO/TO) plan. The document you submitted does not constitute an adequate LO/TO safety plan.
- In the CPR certificate section, attach only valid CPR certificates that are current and less than two years old.
03/17/2026 10:00 AM
- CORRECTED
- CORRECTED
- NOTED
03/25/2026 10:17 AM
General Information
Subcontractor:
Stryker Electrical Contracting, LLC
Subcontractor Project Manager:
KEVIN JULIANO/LAMAYA JENNINGS
Phone #:
7722193389
CODE:
0960239887
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.
Person Responsible for Submitting the Information: