top of page
267H1 - Ft. Lauderdale Esp renovations
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
Mobilization Not Approved:
- The OSHA 300 logs must be printed, signed, and scanned, with the correct information. Please remember that the OSHA 300 is only required for companies with 10 or more employees on payroll.
- The COI does not include Workers’ Compensation.
- The Basic Safety AHA was not properly completed. It must include the project information and all relevant details.
//////// NEW NOTES///////
- The OSHA 300 was not reviewed again since the company has fewer than 10 employees.
- The subcontractor corrected the COI.
- The BASIC SAFETY AHA was submitted properly.
MOBILIZATION HAS BEEN APPROVED
08/14/2025 1:37 PM
General Information
Subcontractor:
Jumep Multy Services LLC
Subcontractor Project Manager:
Emmanuel Lataillade
Phone #:
561-309-6405
CODE:
35478526
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.
Person Responsible for Submitting the Information:
bottom of page