267H1 - Ft. Lauderdale Esp renovations
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
1.- Please attach the OSHA 300A for 2022. In the documents submitted, you only included the forms for 2023 and 2024.
2.- Please attach the correct COI. The one you submitted lists project B69 as the location and project name; as I understand, this form was submitted for 267H1.
3.- Please attach the corresponding SDS. The Safety Plan and the SDS are two different documents.
NEW NOTES/////
1.- CORRECTED
2.- CORRECTED
3.- Please attach the corresponding SDS. The Safety Plan and the SDS are two different documents. NOT CORRECTED
09/05/2025 1:54 PM
NEW NOTES/////
1.- CORRECTED
2.- CORRECTED
3.- CORRECTED
09/12/2025 10:55 AM
MOBILIZATION APPROVED
General Information
Subcontractor:
Pena Alum Glass and Mirror Inc
Subcontractor Project Manager:
Robert Pena
Phone #:
3056401178
CODE:
4315815760
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.