207E1 - USCG STA Islamorada
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
1.- The Safety Plan submitted is not adequate. Please review the list of criteria for submitting your Safety Plan.
I have noticed that your Fall Protection Plan and Excavation Plan are adequate and well structured. I believe the wrong documentation was attached in the APP section by mistake. Kindly review the documentation and resubmit your complete Safety Plan in this section.
09/22/2025 3:51 PM
1.- The Safety Plan submitted is not adequate. Please review the list of criteria for submitting your Safety Plan.
I have noticed that your Fall Protection Plan and Excavation Plan are adequate and well structured. I believe the wrong documentation was attached in the APP section by mistake. Kindly review the documentation and resubmit your complete Safety Plan in this section. NOT CORRECTED
09/24/2025 1:48 PM
TEMPORARY
The mobilization will be temporarily approved. If the subcontractor does not correct the observation, their work will be stopped again.
APPROVED
09/30/2025 2:50 PM
General Information
Subcontractor:
A Steel Fabricators
Subcontractor Project Manager:
Nathan Mikus
Phone #:
240-812-2599
CODE:
801786027
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.
