top of page
196H2 - MDC BLDG 7000
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
Observations:
- Please use the Basic Safety AHA, as previously indicated in your other mobilization forms.
- Correct the description of your Certificate of Insurance (COI).
- Attach the OSHA 10 certificates of your workers.
09/17/2025 10:29 PM
Observations:
- Please use the Basic Safety AHA, as previously indicated in your other mobilization forms.
- CORRECTED
- Attach the OSHA 10 certificates of your workers.
09/19/2025 09:46 AM
General Information
Subcontractor:
Advanced Roofing
Subcontractor Project Manager:
Julian Olarte
Phone #:
9545226868
CODE:
427810
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.
Person Responsible for Submitting the Information:
bottom of page
