708B - HARB

Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.

OBSERVATIONS:

1.- The EM 385-1-1 standards and LEGO CO policies do not recognize the “Safety Monitor” as an acceptable fall protection system. Please make the necessary corrections to ensure your Safety Plan complies with the current regulations.

2.- The OSHA 300A for 2024 must be signed.

3.- Please review your Fall Protection Plan to ensure it complies with EM 385-1-1 standards.

4.- Complete the SDS properly, including all materials (chemicals) that will be used. Do not omit any, including fuels and adhesives.

5.- Complete the OSHA 10 certification for your workers. You only submitted the certificate for one worker. As I understand it, more than one worker will be required to complete this work, so please submit the corresponding certificates.

 

9/2/2025 2:47 PM

 

OBSERVATIONS:

1.- CORRECTED

2.- CORRECTED

3.- CORRECTED

4.- CORRECTED (only one chemical submitted) If other Chimicals found in the project all subcontractor activity will be stoped.

5.- Complete the OSHA 10 certification for your workers. You only submitted the certificate for one worker. As I understand it, more than one worker will be required to complete this work, so please submit the corresponding certificates. NOT CORRECTED

6/- The COI certificate is not adequate; the holder is listed as PUBLIX, and both the address and the description are incorrect.

9/3/2025 6:31 PM

 

 

OBSERVATIONS:

1.- CORRECTED

2.- CORRECTED

3.- CORRECTED

4.- CORRECTED (only one chemical submitted) If other Chimicals found in the project all subcontractor activity will be stoped.

5.- Complete the OSHA 10 certification for your workers. You only submitted the certificate for one worker. As I understand it, more than one worker will be required to complete this work, so please submit the corresponding certificates. NOT CORRECTED

6/- The COI certificate is not adequate; the holder is listed as PUBLIX, and both the address and the description are incorrect. NOT CORRECTED

09/05/2025 11:39 AM

 

OBSERVATIONS:

1.- CORRECTED

2.- CORRECTED

3.- CORRECTED

4.- CORRECTED (only one chemical submitted) If other Chimicals found in the project all subcontractor activity will be stoped.

5.- Complete the OSHA 10 certification for your workers. You only submitted the certificate for one worker. As I understand it, more than one worker will be required to complete this work, so please submit the corresponding certificates. NOT CORRECTED

6/- CORRECTED

 

09/08/2025 01:09 PM

General Information

Subcontractor:
ARI
Subcontractor Project Manager:
Julian Olarte
Phone #:
305-456-2544,1102
CODE:

83589372

SECTION #1: Job-Site Specific Accident Prevention Plan

Please download the documents you wish to review.

Accident Prevention Plan

Safety Plan

Key personnel

Key Personnel

Emergency List

Emergency List

OSHA 300

OSHA 300 (1)
OSHA 300 (2)
OSHA 300 (3)

Appointment Letter

Appointment Letter

Basic Safety AHA:

Basic Safety AHA
7.-

Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?

Fall Protection
Fall Protection Plan
8.-

Do you plan to perform any excavation work at any point during your project?

Excavation
Excavation Plan
9.-
10.-

Do you anticipate performing any electrical or demolition work at any stage of your project?

LO/TO
LO/TO Plan

Attach a copy of your Certificate of Insurance (COI):?

COI
11.-

SDS

SDS

SECTION #2: Required Training

OSHA 30

OSHA 30

OSHA 10

First Aid CPR

OSHA 10
First Aid/CPR

Fall Protection

Fall Protection Certificate

SECTION #3: Equipment Certification (If Applicable)

Do you plan to use any of the following equipment during your activities on the project?

Scissor Lift
Boomlift
Forklift
Welder
Heavy Equipment (Excavator, etc)

If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.

Operator Certificate
Operator Certificate
Operator Certificate

Person Responsible for Submitting the Information:

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421

Miami  |  Tampa  |  Orlando  |  Palm Beach  |  Jacksonville

Copyright © 2024 LEGO Construction Co. All Rights Reserved

bottom of page