708 B HARB
Please address the following observations ONLY, and change the status to "READY TO REVIEW".
If you have any questions, please contact me by email at rq@legocc.com.
Thank you.
1.- The Safety Plan you submitted is being temporarily approved. The plan must be improved and may require modifications either before or after your mobilization.
2.- Please attach and submit the OSHA 300A forms for 2024, 2023, and 2022. The document you provided is an Excel file, not the proper form.
3.- It is recommended to update Mr. Pedro Garcia’s OSHA 30. The card identification number is not legible; however, this observation does not need to be corrected at this time.
08/20/2025 6:06 PM
MOBILIZATION APPROVED
08/22/2025 11:06 AM
General Information
Subcontractor:
P.M. Electrical Contractors, Inc.
Subcontractor Project Manager:
Pedro B. Garcia
Phone #:
3057964940
CODE:
8069697737
SECTION #1: Job-Site Specific Accident Prevention Plan
Please download the documents you wish to review.
Accident Prevention Plan
Key personnel
Emergency List
OSHA 300
Appointment Letter
Basic Safety AHA:
7.-
Do you plan to perform work at heights greater than 6 feet at any time using ladders, scaffolds, or any aerial work platform (AWP)?
8.-
Do you plan to perform any excavation work at any point during your project?
9.-
10.-
Do you anticipate performing any electrical or demolition work at any stage of your project?
Attach a copy of your Certificate of Insurance (COI):?
11.-
SDS
SECTION #2: Required Training
OSHA 30
OSHA 10
First Aid CPR
Fall Protection
SECTION #3: Equipment Certification (If Applicable)
Do you plan to use any of the following equipment during your activities on the project?
If you answered “Yes” to any of the previous questions, please attach the certificate(s) of the operator(s) below.